The Association of Model Submariners.

Would you like to react to this message? Create an account in a few clicks or log in to continue.

* THE FORUM FOR ALL THOSE INTERESTED IN BUILDING AND OPERATING MODEL SUBMARINES *



Join the AMS - Registered Forum users can become members of the AMS and it's free ...... To join send an email with your name , address and phone number to amstreasure@googlemail.com


For a guide to past events see the "Shows and Events" section.

Papplewick Pumping Station SUBMARINE Day. 31st March - 1st April 2024.

$$$

&&&

::::

Who is online?

In total there are 4 users online :: 0 Registered, 0 Hidden and 4 Guests

None


Most users ever online was 180 on Tue Nov 05, 2019 6:03 am

Latest topics

» 868/915 Mhz as a viable frequency for submarines.
LOS ANGELES build logs EmptyWed Apr 10, 2024 5:48 am by tsenecal

» Modulated electric fields for submarine communication in a "heads up" from Harry!
LOS ANGELES build logs EmptyTue Apr 09, 2024 7:33 pm by geofrancis

» Laser cut Robbe U47 conversion
LOS ANGELES build logs EmptyTue Apr 09, 2024 3:40 pm by david f

» ExpressLRS - 868/915 Mhz equipment
LOS ANGELES build logs EmptyTue Apr 02, 2024 3:27 pm by tsenecal

» Information on camouflage patterns for German seahund
LOS ANGELES build logs EmptyFri Mar 15, 2024 4:36 pm by david f

» WW2 mini sub build
LOS ANGELES build logs EmptyTue Mar 12, 2024 1:56 pm by geofrancis

» Not the hobby I expected :)
LOS ANGELES build logs EmptySun Mar 10, 2024 6:30 pm by cat

» Sheerline gasket material
LOS ANGELES build logs EmptyMon Feb 19, 2024 9:24 pm by Michaelc

» Choice of CAD software and Printer for 3D printing
LOS ANGELES build logs EmptyThu Feb 15, 2024 1:53 pm by david f

Statistics

Our users have posted a total of 12441 messages in 1980 subjects

We have 1008 registered users

The newest registered user is chargerdodge

Similar topics

+5
david f
willte
tattooed
Tom(ADMIN)
profesorul
9 posters

    LOS ANGELES build logs

    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty LOS ANGELES build logs

    Post  profesorul Wed Feb 05, 2014 9:05 pm

    HELLO ALL ,

    Be ADVICE : Is gonna be a very long thread so PLEASE have patience !

    Earlier this week I took courage and I start working on these project .
    That is a LOS ANGELES submarine bought it from someone on the forum .
    - I started with rudders depth as required for the large volume of Sisyphus work ....

    - after many, many hours of sanding an file I managed to do what you can see in the pictures...
    HOW TO FIX :
    1) file until get same length?
    2) fill until get same length ?
    LOS ANGELES build logs Differ12
    LOS ANGELES build logs Differ13

    - then continued with bow rudders ....NO problems here ,

    - with tower is another story and I have some questions about the place to put axis for Bow Rudders ....( see pictures )
    LOS ANGELES build logs Ax11

    - I do not know what those two parts are and which should be put it ( see pictures )
    LOS ANGELES build logs Corect11

    and the last question from these series :
    1) what are those holes and witch should be drilled ( I think some of them should be don do the captive air !)
    LOS ANGELES build logs Holes11

    LOS ANGELES build logs Dive_r11
    LOS ANGELES build logs Stern_10
    OK for now,

    THANK YOU

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Fri Feb 07, 2014 9:40 am

    For the moment all I have is these :
    LOS ANGELES build logs Img_0210
    LOS ANGELES build logs Img_0211
    LOS ANGELES build logs Img_0212
    LOS ANGELES build logs Img_0213
    LOS ANGELES build logs Wtc_ar10



    - any suggestion about Reliable Speed Controller ......Fail Safe devices and what else should be ?
    - the RC is FUTABA 6EXP - 6 channels (4 + 2 ) ,40MHz .
    I know is an very old model but that's gonna be do the small budget  

    Cam on don't be shy !  

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Tue Feb 11, 2014 3:59 pm

    No idea nobody?.....hmmm.
    avatar
    Tom(ADMIN)
    AMS Forum Owner


    Posts : 3024
    Join date : 2010-11-05
    Age : 64
    Location : Nevada, USA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  Tom(ADMIN) Thu Feb 13, 2014 4:18 pm

    Marius, apologies for not answering your post, I haven't been too good recently.

    I'll post up some pics tomorrow of how I did mine...


    Richard
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Wed Feb 26, 2014 10:19 am

    RICHARD , IS NO NEED to APOLOGIES my Friend , last time when I checked "was a Forum not a Marriage" (laughing)
    How are you filling these days ?......I hope You are in Good Shape .

    Did You get the time to find some pictures with Your LA sub ?.

    QUESTION:
    I found these Water Pump on eBay

    http://www.ebay.com/itm/WATER-PUMP-Electric-6v-12v-rc-model-boat-Robbe-p-/120777343795#ht_1961wt_867

    can be used to Fill/Empty a ballast tank for my LA sub ?.....is necessary to have a speed controller for it?.....how about the price/seller?.
    My intention is to buy 2 pieces , one for these project and one for spare for another project .

    MARIUS
    avatar
    Tom(ADMIN)
    AMS Forum Owner


    Posts : 3024
    Join date : 2010-11-05
    Age : 64
    Location : Nevada, USA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  Tom(ADMIN) Wed Feb 26, 2014 10:50 am

    That water pump will be fine, Marius...it's reversible, so you can fill/empty your ballast tank with it.

    You can either use a speed controller or a pair of microswitches on a servo to operate it, I use microswitches...easier to install and a lot cheaper too.

    Have a look at the Skipjack build log for information as to how to install your dive planes, it's practically identical in the way it's set up.


    Richard
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Thu Feb 27, 2014 9:54 am

    THANK YOU ,

    I like the idea to use microswitches .
    Any recommendation for : what type/brand ?........I don't know how much Amps will draw the pump ?

    Looking throw Your SKIPJACK thread I found these picture and I have a couple of these around here somewhere (deep down In a closet !) , I suppose I can use them right ?

    LOS ANGELES build logs Wtc_co11

    MARIUS
    avatar
    Tom(ADMIN)
    AMS Forum Owner


    Posts : 3024
    Join date : 2010-11-05
    Age : 64
    Location : Nevada, USA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  Tom(ADMIN) Thu Feb 27, 2014 10:32 am

    They will be fine for your water pump, Marius...I've used them for all sorts of things and never burnt one out yet.

    Richard
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Thu Feb 27, 2014 8:56 pm

    OK , THANKS .

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Thu Mar 06, 2014 12:02 pm

    HI ,

    To day I am very glad because I did some progress on the project.I know is NOT very much but when You don't have SPARE time at all and Your work shop is the kitchen and work bench is kitchen table - IF YOU GET THE PERMISSION from "MASTER CHEF" my WIFE !!!  is A PROGRESS .

    Couple days a go I glued a piece of PVC sheet on both Dive Planes . I din't have to file them to shape .

    LOS ANGELES build logs Img_0214
    LOS ANGELES build logs Img_0215
    LOS ANGELES build logs Img_0216

    Yesterday and to day I did the Motor mount from a small piece of aluminum sheet .
    It was necessary to Drill , cut , tap , file .
    Doesn't look much but I keep the tools in to a small crowded closet , some of them on balcony , where is my lathe too !!! .  
    When I tray to do something it need 30min to get the tool down and another 30min - 40min to clean the work place .
    I told You all these to see way is gonna be a very long thread plus the "dam found" always missing !.

    LOS ANGELES build logs Img_0217
    LOS ANGELES build logs Img_0218
    LOS ANGELES build logs Img_0220
    LOS ANGELES build logs Img_0221
    LOS ANGELES build logs Img_0222
    LOS ANGELES build logs Img_0223
    LOS ANGELES build logs Img_0224

    See You soon..... I HOPE .

    All the Best,

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Mon Mar 10, 2014 11:38 am

    HI ,

    Regarding some Advices  I did some Work on NEW Motor Mount , and these is the Result:

    LOS ANGELES build logs New_mo11
    LOS ANGELES build logs New_mo10
    LOS ANGELES build logs New_mo12
    LOS ANGELES build logs New_mo13
    LOS ANGELES build logs New_mo14


    Here I encountered a small Problem solved by cutting some material :
    LOS ANGELES build logs New_mo15
    LOS ANGELES build logs New_mo16
    LOS ANGELES build logs New_mo17
    LOS ANGELES build logs New_mo18
    LOS ANGELES build logs New_mo19
    LOS ANGELES build logs New_mo20

    All the Best and CLEAR WATERS

    MARIUS
    avatar
    Tom(ADMIN)
    AMS Forum Owner


    Posts : 3024
    Join date : 2010-11-05
    Age : 64
    Location : Nevada, USA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  Tom(ADMIN) Mon Mar 10, 2014 4:45 pm

    Coming along nicely, Marius...I like the motor mount, very ingenious.


    Richard
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Mon Mar 10, 2014 7:37 pm

    THANKS RICHARD ,

    Very Slowly !. NO spare time !.

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Fri Mar 14, 2014 10:47 am

    HI GUYS ,  

    I did some work to day. Is not exactly " a piece of art" but is Hand Made , my HANDS ! so is perfect . I am joking of course . If there are some aspect witch can be improved be Free to tel me .
    What I did today is actually 2 small bronze pieces , for rods control of rudders and dive planes . (I KNOW here is not quite Good English Grammatic  !!!).

    LOS ANGELES build logs 01_15

    LOS ANGELES build logs 02_15

    LOS ANGELES build logs 03_15

    LOS ANGELES build logs 04_15

    LOS ANGELES build logs 05_15

    All The Best and CLEAR WATERS

    MARIUS
    tattooed
    tattooed
    AMS member


    Posts : 340
    Join date : 2011-05-16
    Age : 60
    Location : Bristol

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  tattooed Fri Mar 14, 2014 7:04 pm

    very nice marius very nice indeed
    avatar
    Tom(ADMIN)
    AMS Forum Owner


    Posts : 3024
    Join date : 2010-11-05
    Age : 64
    Location : Nevada, USA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  Tom(ADMIN) Fri Mar 14, 2014 7:16 pm

    Looking good Marius...looking good.


    Richard
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Fri Mar 14, 2014 7:34 pm

    My intentions are to AVOID the O-rings on push rodes . Do you think is possible to use around the push rodes only grease to stop water go inside ??? . I don't have space for the O-ring inside those pieces .

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Sat Mar 15, 2014 6:20 pm

    HI there ,

    I did some progress to day . I made the propeller shaft house . I don't know if is going to be the final , that's hard to say now . Wheel shall see . Any way these cames out after a 3 - 4 hours of hard work  . Way take so much , is because I was going in just 0,010mm too MUCH  and the Ball Bearing wasn't going as is should be . You now what I mean . I HAVE MY LIMITS !!!. I don't have the skills and the technick to do that kind of work from the first time . On the 3rd TIME It was Good Anough to give hem a shot .
    Any tips/tricks/ would be great for those kind of operation in a very close future .

    LOS ANGELES build logs 01_1510
    .A = Hight for the Ball Bearing ; B = hight for the Simmering . You can see way was a Little difficult to succeed from the first tray .

    LOS ANGELES build logs 02_1510
    LOS ANGELES build logs 03_1510

    My expectation is to be both the Rod Guides and sealing at the same time . I wheel tray to make as tight as possible the hole for the rod and with some good White Grease to manage to seal .
    Do You think is gonna be possible ?.
    I forget to mention the Rod Guides is going to be attached to Rubber Push Rod Seal (similar to these ):
    LOS ANGELES build logs Bellow10

    All the Best and CLEAR WATERS

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Tue Mar 18, 2014 8:09 pm

    That's my latest work :

    LOS ANGELES build logs ><a href=LOS ANGELES build logs WTC_Propeller_Shaft_0"

    LOS ANGELES build logs WTC_Propeller_Shaft_1

    LOS ANGELES build logs WTC_Propeller_Shaft_2

    MARIUS

    P.S I ordered 2x15A MARINE VIPER/Mtronik Speed Controllers .
    LOS ANGELES build logs Viperm11
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Wed Mar 19, 2014 12:46 pm

    Hi ,
    Some ultimate arangements for the Push Rods and Propeller Shaft Sealing :

    LOS ANGELES build logs Push_r10

    LOS ANGELES build logs Push_r11

    LOS ANGELES build logs Final_10

    LOS ANGELES build logs Final_11

    LOS ANGELES build logs Final_12

    LOS ANGELES build logs Wite_g10

    MARIUS
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Fri Mar 21, 2014 7:21 pm

    And some Little Work to Day . Doesn't Matter if after 4H of hard working I end up with 2 BROKEN pieces !!! .
    The Biggest one was the FIRST to see how is it going and what I have to do . It seems there is not always true what they say: NEXT TIME is Going to Make Better
    .

    LOS ANGELES build logs Rodes_10


    How is it cold these SMALL Black piece?
    LOS ANGELES build logs Rodes_11


    How is it cold these BRONZE Piece I made ?
    LOS ANGELES build logs Rodes_12


    Where I can get those SMALL Black piece , 3mm ; 4mm ; 5mm inside Diameter ?.

    All the Best and CLEAR WATERS


    MARIUS
    avatar
    willte
    Guest


    Posts : 119
    Join date : 2013-12-15
    Age : 71
    Location : lossiemouth morayshire

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  willte Fri Mar 21, 2014 7:55 pm

    little black things are E clips you can get them on e-bay the parts you made clevice links
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Fri Mar 21, 2014 8:03 pm

    THANKS @willte .
    profesorul
    profesorul
    Guest


    Posts : 386
    Join date : 2011-07-03
    Age : 59
    Location : Bucuresti, ROMANIA

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  profesorul Mon Mar 24, 2014 10:52 am

    HI there ,

    Some activity on the project.

    I did the rudders and dive planes bushings connectors for control rods ;
    Materials:
    - bronze bar 6mm diameter......I made the 2mm hole for rod and to hold them in place , was done with M3 threaded bolts ;
    - bushings for rods were made ​​of bronze 4mm bar with 2.1mm hole ;

    LOS ANGELES build logs Conect10

    LOS ANGELES build logs Conect11

    LOS ANGELES build logs Conect12

    LOS ANGELES build logs Sleeve10

    MARIUS
    tattooed
    tattooed
    AMS member


    Posts : 340
    Join date : 2011-05-16
    Age : 60
    Location : Bristol

    LOS ANGELES build logs Empty Re: LOS ANGELES build logs

    Post  tattooed Mon Mar 24, 2014 6:46 pm

    nice work marius keep it going mate

      Current date/time is Fri Apr 19, 2024 10:43 am